SAP PP Online Quiz
Following quiz provides Multiple Choice Questions (MCQs) related to SAP PP. You will have to read all the given answers and click over the correct answer. If you are not sure about the answer then you can check the answer using Show Answer button. You can use Next Quiz button to check new set of questions in the quiz.
Q 1 - Which of the following Transaction code can be used to check PP tables in SAP ECC system?
Answer : A
Q 2 - When you create a Material BOM without a Plant is known as?
Answer : C
Q 3 - Which of the following T-code can be used to change Routing in PP?
Answer : B
Q 4 - SAP Production Planning is integrated with which of the following modules?
Answer : E
Q 5 - Long Term Planning is not actual run but is used to see if all capacity requirement can be fulfilled and you can also transfer simulative area to operative area if requirements are fulfilled?
Answer : A
Explanation
Long term planning in SAP PP is used to check future demands at all Bill of Material level. You can check the current capacity and vendor ability to provide the material in required time period.
This is not actual run but is used to see if all capacity requirement can be fulfilled and you can also transfer simulative area to operative area if requirements are fulfilled.
Q 6 - Which of the following Transaction code is used to display Production Lot?
Answer : B
Q 7 - Simulative planning is performed only for long duration and it is not performed for short term and when there is no time restriction?
Answer : B
Q 8 - When material is produced as per Production order and goods is placed at storage location, which of the following is correct?
A - Stock Quantity is increased and movement type is 103
B - Stock Quantity remain same and movement type is 103
Answer : C
Explanation
Good receipt is performed when material is produced as per Production order and goods is placed at storage location. The stock quantity is increased and movement type 101 is entered.
Q 9 - Which of the following report is used to collect information about hierarchy of work center of a shift?
Answer : B
Q 10 - Long term planning is almost similar to Material requirement planning in simulate version to predict the production plan as per future requirements?